New Project from acQuire

Use the DH-Data > New Project > New Project from acQuire menu option (ACQHOLE GX) to import drillhole information from acQuire database through ODBC connection.

Drillhole - New Project from acQuire dialog options

Project Name

Name of the project to import.

Script Parameter: ACQIMPORT.PROJECT

Project directory

The directory in which to create the new drillhole project. (read only)

Script Parameter: DH.PROJECT_DIR

Load Parameter Setting

Parameter setting file.

Script Parameter: ACQIMPORT. PARFILE

Auto-convert negative assays?

If "yes", all values in data recognized as "Assay" type are scanned on import, and those values less than zero are replaced by positive values one-half the size (e.g. values are multiplied by –0.5). This operation is made under the assumption a negative values is actually the negative detection limit of the assay in question. For statistical reasons, these values are replaced with one-half the detection limit. By default, negative assay values are not auto-converted.

Script Parameter: ACQIMPORT. CONVERT_NEGATIVES

Directory

Specify the directory in which to create the new drillhole project.

Application Notes

Drillhole information is imported into four GDB files, which are in compatible format for the Drillhole, XXXX_Collar.gdb, XXXX_assays.gdb, XXXX_geology.gdb and XXXX_survey.gdb where XXXX is the project name given in the dialog.

Refer to the acQuire’s documents about data selection and query using the "Select data from acQuire" dialog.